the key control points for the construction of steel structure factory buildings, organized by phase for clarity
1. Pre-construction Preparation
-
Design and Drawing Review: Before construction, conduct a thorough review of the design drawings. This involves checking for errors, omissions, and ensuring constructability. A joint review by designers, contractors, and supervisors is crucial to resolve issues early
.
-
Raw Material Quality Control: Strictly control the quality of steel and other materials like welding rods and high-strength bolts. Ensure they have complete quality certificates and undergo necessary re-inspections to confirm they meet design standards
.
-
Construction Organization Design: Develop a detailed construction plan and quality control scheme. This should address potential problems, define sequences (especially for lifting and installation), and set quality standards
.
📐 2. Foundation and Embedded Parts
-
Foundation Accuracy: The foundation's axis, elevation, and especially the positioning of embedded anchor bolts must be precisely controlled. Even minor deviations can affect the entire superstructure's alignment. Re-measure and confirm these values before concrete pouring and after it sets
.
-
Anchor Bolt Protection: Protect the threaded parts of anchor bolts from damage and corrosion during concrete pouring, often by wrapping them
. Before column erection, clean the bolts and apply grease .
🔩 3. Steel Component Installation and Connection
This is the most critical phase for structural integrity.
-
Lifting and Hoisting: Develop a specialized lifting plan. It must define the lifting sequence (typically from a stable bay near the gable outward, and from main to secondary beams), lifting points, and temporary support measures to prevent deformation or collapse
.
-
Component Correction: After a component (like a column) is hoisted, temporarily brace it immediately. Use tools like经纬仪 (theodolites) to carefully correct its verticality and elevation. Correction should consider environmental factors like temperature
.
-
High-Strength Bolt Connections: The friction surfaces of connected components must be clean and dry. Bolts should be freely inserted—forced insertion or reaming holes is prohibited. Tightening must follow a strict sequence (typically from the center of a joint outward), performed in initial tightening and final tightening stages using a calibrated torque wrench
.
-
Welding Quality Control: Welding is a special process requiring strict control. Welders must be certified. Use qualified welding procedures: pre-clean the welding area, preheat if necessary, and control parameters. After welding, conduct visual inspections and Non-Destructive Testing (NDT) like ultrasonic testing for critical welds to detect defects like cracks or porosity
.
-
Error Control: Monitor cumulative errors during installation. Regularly survey the installed structure's axis and elevation to prevent small deviations from adding up to unacceptable levels
.
🛡️ 4. Anti-Corrosion and Fireproofing
-
Surface Treatment: Before painting, steel surfaces must be thoroughly cleaned of rust, oil, and dust. Shot blasting is commonly used to achieve the required cleanliness and roughness grade, which is essential for paint adhesion
.
-
Coating Application: Painting should be done in a dust-free environment with suitable temperature and humidity. Control the paint mix ratio, number of coats, and dry film thickness to meet design specifications. Inspect the coating for uniformity, absence of leaks, and good adhesion
.
-
Fireproofing: Apply fire-resistant coatings as required. The application thickness and evenness must meet the design's fire resistance rating
.
⚙️ 5. Safety and Management
-
Safety Measures: Implement strict safety protocols for high-altitude operations, lifting, and temporary electricity use. Erect safety nets and require personal protective equipment (PPE). During installation, use缆风绳 (guy ropes) to stabilize structures
.
-
Documentation and Acceptance: Maintain complete records for each step: material certificates, inspection reports, welding logs, and completion acceptance records for each sub-project
.
In summary, successful steel structure factory construction hinges on meticulous control from design and materials to precise installation and connection techniques, all underpinned by rigorous quality checks and safety management. |